Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Ackerman, P J, Jr. (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

  • Type: Thesis
  • Keywords: decision support; artificial intelligence; building design; building information model; building information modeling; business model; decision making; design decision; interview; prototype development
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1906287665
  • Abstract:
    There is a body of evidence indicating that the implementation of current Architecture, Engineering, and Construction (AEC) industry business models and practices have caused negative impacts on global energy supply, ecosystems, and local or regional economies. In order to eliminate such negative impacts, AEC practitioners are seeking new business models in which the Building Information Modeling (BIM) technology can be considered an important technology driver. Despite the fact that the majority of AEC practitioners have used BIM tools for construction-level modeling purposes, some early adopters of BIM technology began to use BIM tools to better inform their design decisions. Corresponding to the increasing demand for decision support functionality, a number of studies showed that a part of BIM technology will be developed toward decision support and artificial intelligence domains. The use of computer-based systems to support decision making processes can usually be found in the business management field. In this field, decision support and business intelligence systems are widely used for improving the quality of managerial decisions. Because of its theories and principles, Decision Support Systems (DSS) can be considered as one of the potential information technologies that can be applied to enhance the quality of design decisions. The DSS also has the potential to be constructed as a system platform for implementing building information contained in BIM models associated with other databases, analytical models, and expert knowledge used by AEC practitioners. This study explores an opportunity to extend the capability of BIM technology toward the decision support and artificial intelligence domains by applying the theories and principles of DSS. This research comprises the development of a prototype BIM interoperable web-based DSS for vegetated roofing system selection. The prototype development can be considered a part of an ongoing research agenda focusing on the development of the integrated web-based DSS for holistic building design conducted within the College of Architecture and Urban Studies (CAUS), Virginia Tech. Through a post-use interview study, the developed prototype is used as a tool for evaluating the possibility for the DSS development and the usefulness of DSS in improving the quality of vegetated roofing system design decisions. The understanding gained from the post-use study is used to create a guideline for developing a fully functional DSS for holistic building design that will be developed in the future.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, Q (2007) An object model framework for interface management in building information models, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, J S (1995) Reliability-based design of a retaining wall, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Mitchell, Z W, Jr. (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Novak, V M (2012) Managing sustainability value in design: A systems approach, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Platt, R T (1998) Development of a ready-to-assemble construction system, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Prateapusanond, A (2004) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Sands, K S, II (2014) Ethics education and its relationship to undergraduate construction students' professional ethical sensitivity, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.